تخطَّ إلى المحتوى
OreMaps
النحاس إنتاج تعدين تحت الأرض ★ مميّز

Olympic Dam

South Australia, Australia · -30.440°, 136.890°

احتياطيات الخام
٣٫٢ مليار t
الدرجة
1.8 %
المعدن المحتوي
٥٧٫٦ ألف t
الإنتاج السنوي
٢١٠ ألف t/yr
سنة الاكتشاف
1975
بدء الإنتاج
1988

نظرة عامة

The Olympic Dam deposit is one of the notable copper assets in Australia. It is currently classified as producing and uses underground extraction methods. Reported ore reserves total approximately 3,200,000,000 tonnes at a grade of 1.8 %. Contained metal is estimated at 57,600 tonnes. Annual production is around 210,000 tonnes per year. Commercial production began in 1988. The deposit was first identified in 1975. Geographic coordinates are -30.44 latitude and 136.89 longitude.

الموقع

الدولة
Australia
المنطقة
South Australia
Latitude
-30.4400
Longitude
136.8900

الأسئلة الشائعة

How large are the ore reserves at Olympic Dam?

Reported ore reserves total approximately ٣٫٢ مليار tonnes, at an average grade of 1.8 %, containing about ٥٧٫٦ ألف tonnes of contained metal.

Where is Olympic Dam located?

Olympic Dam is located in South Australia, Australia, at coordinates -30.44°, 136.89°.

What is the current status of Olympic Dam?

Olympic Dam is currently classified as producing, with underground operations. Production began in 1988.

How much does Olympic Dam produce each year?

Reported annual output is approximately ٢١٠ ألف tonnes per year.

رواسب النحاس أخرى